ARCHIVES

Research Article

Scheduling of a School Project Considering Risk Analysis Utilizing Project Management Tool Primavera P6

Dinesh Goyal1 Hitesh Kodwani2
12Department of Civil Engineering, Sam Global University, Bhopal, India.

Published Online: March-April 2023

Pages: 522-526

References

[1] Piyush Pramod Bagade and Prof. Abhijit Bhirud, “Review on construction project management software primavera p6” international
journal of engineering sciences & research technology, ISSN: 2277-9655, January, 2018, PN (110-117).
[2] Poonam Raykar and Ghadge A.N., “Analyzing the Critical Factors Influencing the Time Overrun and Cost Overrun in Construction
Project” International Journal of Engineering Research, Volume No.5, ISSN:2319-6890, 9 Jan 2016, PN (21-25).
[3] A. Ray Chaudhuri, B. Sivakonda Reddy and S.K. nimbal, “Resource Management in Construction Projects – a case study” Engineering Science and Technology: An International Journal (ESTIJ), ISSN: 2250-3498, Vol.2, No. 4, August 2017 PN (660 – 665)
[4] A.R. Nikumbh and S.S. Pimpliker, “Planning and controlling of a National Highway Project- A case study”, Journal of the Indian Road
Congress Paper No.613, April – June 2014 PN (91 – 102).
[5] P M Wale1 , N D. Jain , N R Godhani , S R Beniwal and A A Mir, «Planning and Scheduling of Project using Microsoft Project (Case
Study of a building in India», IOSR Journal of Mechanical and Civil Engineering, ISSN: 2320-334X, Volume 12, Issue 3 Ver. III (May. - Jun.2015), PN 57-63.
[6] Shaik Mohammad, Kunal B. Badgujar, B.A.Konnur and Amarsinh B. Landage “A Review of EVM Analysis with Primavera”;
International Journal of Engineering Research ISSN:23196890(online),2347-5013 Volume No.5, Issue Special 1 9 Jan 2014 PN: 164-167
[7]. Hamid, R. Gupta, Parag S. Mahatme and Taran C. Bhagat “The cost controlling and monitoring of Construction project through earned Value management system” International Journal of Advanced Technology in Engineering and Science www.ijates.com Volume No 03,Special Issue No. 01, March 2013 ISSN (online): 2348 – 7550
[8] P.Dayakar and M.Udhayakumar, «Study on Project Management of an Ongoing Construction project Using MSP Sub Structure”
Volume2 Issue 5 Number2–Oct 2012, PN 202-212.
[9] Stephenson, P. and Fapohunda, J.A. “Optimal Construction Resources Utilization: Reflections of Site Managers’ Attributes. The Pacific Journal of Science and Technology, Vol. 11. No. 2. November 2010 (Fall) PN 105-109.
[10] Tranner, D. S. Stephan Jabasingh and J. Jayalakshmi “Analysis of Cost Controlling In Construction Industries by Earned Value
Method Using Primavera”; Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 6(
Version 1), June 2009, PN.145-153.
[11] Prabhakar, G. P. What is Project Success: A Literature Review. International Journal of Business and Management. September, 2008.

Related Articles

2023

A Mobile Application to Promote the Idea of Recycling

2023

Web Based Printing Press Management System (WBPPMS)

2023

Review: CFD Analysis Of triangular, square and Circular Shaped Helical Coil Heat Exchanger by Using Titanium Oxide Nano fluid

2023

Review: Steady and Transient Thermal Analysis of 100 Cc Engine at 3000c, 5000c & 7000c

2023

Overview of Advancement of Inventory Models for Deteriorating Items with Time Based Uniform Price

2023

Enhanced Dynamic Voltage Restorer for Improving the Power Quality Using RETO Algorithm

Share Article

X
LinkedIn
Facebook
WhatsApp

Or copy link

https://theijire.com/archives/10.59256/ijire.2023040223

*Instagram doesn't support direct link sharing from web. Copy the link and share it in your Instagram story or post.