ARCHIVES

Research Article

Monitoring and Sceduling of a Bridge Using Primavera: A Review

Singh Sagar Amarendra1 Hitesh Kodwani2
12Department of Civil Engineering, Sam Global University Bhopal, India.

Published Online: May-June 2023

Pages: 388-392

References

1) KeshavPhophalia and RiddhaBasu, [EVALUATION OF MICROSOFT PROJECT AND PRIMAVERA P6 AS CONSTRUCTION
PROJECT MANAGEMENT SOFTWARE IN INDIA], INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING
RESEARCH AND TECHNOLOGY [IJIERT] ISSN: 2394-3696 VOLUME 5, ISSUE 3, Mar.-2018.
2) A.A.Lakade, A.K.Gupta and D.B.Desai, [A Project Management Approach Using Erp And Primavera In Construction Industry], IOSR
Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 2278-1684, PP: 21-24, 2020.
3) AnuragMahure and Amit kumarRanit, [Construction Project Analysis Using Primavera P6], JASC: Journal of Applied Science and
Computations, Volume 5, Issue 8, August /2018, ISSN NO: 1076-5131.
4) Divya V S and C Gayathri, [Flexible Scheduling in Construction Industry by Using Primavera], International Journal for Modern
Trends in Science and Technology ISSN: 2455-3778, Volume: 06, Issue No: 04, April 2020.
5) YashPandit, Swaroop Kulkarni, YashChoulwar, SoumitraKher and S.D.Marawar, [Analysis of Planning and Scheduling Using
Traditional and Primavera Approach], International Journal of Innovative Research in Science, Engineering and Technology, Vol. 6,
Issue 4, April 2017.
6) T.Subramani and K.Chinnadurai, [Construction Management And Scheduling Of Residential Building Using Primavera],
International Journal of Application or Innovation in Engineering & Management (IJAIEM), Volume 4, Issue 5, May 2015, ISSN 2319
- 4847.
7) V.S. Divya, [Flexible Scheduling For Construction by Using Primavera Software], ICONIC RESEARCH AND ENGINEERING
JOURNALS, NOV 2019 | IRE Journals | Volume 3 Issue 5 | ISSN: 2456-8880.
8) Md. ZishanMallick and MohdZeeshan khan, [CONSTRUCTION PLANNING AND CONTROL USING PRIMAVERA P6], IJARIIE-
ISSN(O)-2395-4396, Vol-5 Issue-4 2019.
9) BalakrishnaCh, AnandGoud K, Akula Prakash and KandlaguntaMounik, [Schedule delay analysis of a multi-storied residential project
using primavera], IOP Conf. Series: Materials Science and Engineering, ICIRMCT 2021.
10) Sudarshan. S and Geena George, [COMPARISON OF PROJECT PLANNING & SCHEDULING SOFTWARE PRIMAVERA AND
MICROSOFT PROJECT USED IN THE CONSTRUCTION INDUSTRY], International Journal of Engineering Technologies and
Management Research Septmber 2021 8(9), 78-87.
11) Hitanshu Saini, Khushpreet Singh and Uma Malik, [PROJECT MANAGEMENT IN CONSTRUCTION USING PRIMAVERA],
International Journal of Civil Engineering and Technology (IJCIET) Volume 8, Issue 8, August 2017, pp. 538–549, Article ID:
IJCIET_08_08_055.
12) K.Priya, M.Kathiresan, D.Vengateshwari and M.Suriyakumari, [PLANNING, ANALYSIS AND CONSTRUCTION SCHEDULING OF
APPARTMENT BUILDING (G+13) BY USING PRIMAVERA P6], International Journal of Scientific Development and Research
(IJSDR), March 2019 IJSDR | Volume 4, Issue 3, ISSN: 2455-2631.

Related Articles

2023

A Mobile Application to Promote the Idea of Recycling

2023

Web Based Printing Press Management System (WBPPMS)

2023

Review: CFD Analysis Of triangular, square and Circular Shaped Helical Coil Heat Exchanger by Using Titanium Oxide Nano fluid

2023

Review: Steady and Transient Thermal Analysis of 100 Cc Engine at 3000c, 5000c & 7000c

2023

Overview of Advancement of Inventory Models for Deteriorating Items with Time Based Uniform Price

2023

Enhanced Dynamic Voltage Restorer for Improving the Power Quality Using RETO Algorithm

Share Article

X
LinkedIn
Facebook
WhatsApp

Or copy link

https://theijire.com/archives/10.59256/ijire.20230403106

*Instagram doesn't support direct link sharing from web. Copy the link and share it in your Instagram story or post.